San Luis Unit Drainage Program, Central Valley Project, California

draft environmental impact statement.
  • 270 Pages
  • 2.47 MB
  • 7941 Downloads
  • English

U.S. Bureau of Reclamation , [Sacramento
Central Valley Project (Calif.). -- San Luis Unit., Drainage -- California -- San Joaquin Va
ContributionsUnited States. Bureau of Reclamation. Mid-Pacific Regional Office.
The Physical Object
FormatMicroform
Pagination12, xi, 270 p.
ID Numbers
Open LibraryOL14685479M

San Luis Unit Project. State: California Region: California-Great Basin Region. Related Documents Organization: South-Central California Area Office Address: "N" Street City: Fresno, CA Phone: Owner Title: Area Office Manager.

The San Luis Drain centers on the controversial idea of funneling agriculture drainage water for discharge in the Sacramento-San Joaquin Delta. The San Luis Drain dates back to the s, conceived as an offshoot of the Central Valley Project in the San Joaquin lly, the project was to have included a mile drainage canal to the ocean.

San Luis Unit Drainage. Background. The San Luis Unit is part of both the federal Central Valley Project (CVP) and the California State Water Project. Authorized by the San Luis Act in June (PL ), it is jointly operated by the Bureau of Reclamation and the California Department of Water Resources (DWR).

The principal. The Central Valley Project (CVP) is a federal power and water management project in the U.S. state of California under the supervision of the United States Bureau of Reclamation (USBR). It was devised in in order to provide irrigation and municipal water to much of California's Central Valley—by regulating and storing water in reservoirs in the northern half of the state (once Annual water yield: 7, acre feet (8, dam³).

InCongress authorized the construction of the San Luis Unit of the Central Valley Project (CVP) in California. California book CVP is a network of dams, canals, pumps, California book other facilities providing water for multiple uses. Located south of the Sacramento-San Joaquin Delta, the San Luis Unit is a component of the CVP and was built jointly by the Department of the Interior's Bureau of Reclamation.

Buy San Luis Unit Drainage Program, Central Valley Project, California draft environmental impact statement (SuDoc I SA 5 L/4/DRAFT) by U.S.

Geological Survey (ISBN:) from Amazon's Book Store. Everyday low prices and free delivery on eligible : U.S. Geological Survey. San Francisco, CA J Mr.

Details San Luis Unit Drainage Program, Central Valley Project, California EPUB

Kirk Rodgers Regional Director U.S. Bureau of Reclamation Mid-Pacific Regional Office Cottage Way Sacramento, California Subject: Final Environmental Impact Statement (FEIS) for the San Luis Unit Drainage Feature Re-evaluation Project, Central Valley Project, California. InReclamation developed a plan for drainage specific to the San Luis Unit based in large part on the recommendations of the San Joaquin Valley Drainage Program.

Shortly thereafter, landowners in the Unit filed suit seeking, among other things, completion of the Drain to Central Valley Project Delta. San Joaquin Valley, California.

The Bureau of Reclamation is re-evaluating options for providing drainage service to the San Luis Unit of the Central Valley Project. The California book evaluates seven action alternatives in addition to No Action: In-Valley Disposal, In-Valley/Groundwater Quality Land Retirement, In-Valley/Water Needs Land Retirement, In.

The Kesterson National Wildlife Refuge was an artificial wetland environment, created using agricultural runoff from farmland in California's Central Valley. The irrigation water is transported to the valley from sources in the Sierra Nevada via the California ls from these sources are carried in the water and concentrated by evaporation from aqueducts, canals, and fields.

san luis unit drainage program central valley project fresno county Download san luis unit drainage program central valley project fresno county or read online books in PDF, EPUB, Tuebl, and Mobi Format. Click Download or Read Online button to get san luis unit drainage program central valley project fresno county book now.

This site is like a. Appendix Major Previous Studies and Activities Related to the San Joaquin Valley Drainage Program (Classic Reprint) [Unknown Author] on *FREE* shipping on qualifying offers. San Luis Unit Feasibility and Definite Plan Reports Ina feasibility report on the San Luis Unit of the Central Valley Project was prepared by the Bureau of Reclamation describing the need.

Download San Luis Unit Drainage Program, Central Valley Project, California PDF

The Sacramento Canals Unit of the Central Valley Project was designed to provide irrigation water in the Sacramento Valley, principally in Tehama, Glenn, and Colusa Counties.

Authorized inthe unit consists of Red Bluff Diversion Dam, Funks Dam, Corning Pumping Plant. Westlands Water District contract.

Hearing, Eighty-eighth Congress, second session, on proposed contract between the Secretary of the Interior and Westlands Water District for construction of a water distribution and drainage collector system in the San Luis Unit, Central Valley Project, California, July 8, [United States] on *FREE* shipping on qualifying offers.

Central Valley Project Improvement Act: hearing before the Subcommittee on Water and Power Resources of the Committee on Resources, House of Representatives, One Hundred Fourth Congress, first session, on H.R.

a bill to amend the Central Valley Project Improvement Act, and for other purposes, J Washington, DC by United. In a March study, The Economic Impacts of Central Valley Salinity, the University of California, Davis reported that if salinity increases at the current rate untilthe direct annual costs will range from $1 billion to $ billion, with income impacts to the Central Valley.

The Friant Division transports surplus northern California water though the southern part of the semiarid Central Valley.

Description San Luis Unit Drainage Program, Central Valley Project, California FB2

The main features of this division are Friant Dam, Friant-Kern Canal, and Madera Canal, all constructed and operated by Reclamation. Vast acreage of agricultural land within the San Luis Unit (SLU) of the Central Valley Project in the San Joaquin Valley of California suffers from soil drainage issues.

The U.S. Bureau of Reclamation (Reclamation) is under obligation to assist with disposal of drainage water from these lands. Secretary of the Interior to provide drainage service to lands served by the San Luis Unit of the Central Valley Project.

In Reclamation signed a Record of Decision selecting a drainage plan and finding that the cost of providing drainage for lands served by the San Luis Unit would be approximately $ billion.

The costs are now estimated. Get this from a library. San Luis Unit Drainage Program, Central Valley Project, California: draft environmental impact statement.

[United States. Bureau of Reclamation. Mid-Pacific Regional Office.;]. An illustration of an open book. Books.

An illustration of two cells of a film strip. Video An illustration of an audio speaker. San Luis Unit, Central Valley Project, California." U.S. Government Printing Office. San Luis Unit Drainage Program preliminary alternatives workshop Januarysupporting information (supplement). The Ninth Circuit Court of Appeals has found that the Department of the Interior is required to provide drainage services for lands served by the San Luis Unit of the Central Valley Project.

either participate with the State in a master drain project or construct the San Luis Interceptor Drain to serve the drainage needs of the San Luis Unit.

The project was revised in to a concrete-lined canal that would drainacres. Inthe plans included a flow regulatory reservoir (known. Shn Luis Unit facilities (which include the San Luis Canal, Coalinga Canal, Pleasant Valley Pumping Plant, and Dos Amigos Pumping Plant), which will be used in part for the fumishing of water to the Contractor pllrsuant to the terms of this Contract; and [3'o] WHEREAS, the rights to Project Water were acquired by the United States pursuant to.

Inthe federal government signed a joint-venture agreement with the State of California for federal construction of the San Luis Unit of the Central Valley Project (CVP). The CVP remains one of the largest public works projects ever conceived and built by man.

Groundbreaking of the San Luis Unit of the Central Valley Project took place in. San Luis Unit Drainage Services. The San Luis Act of (Pub. ) requires the BOR to provide drainage services to water districts in the San Luis Unit of the Central Valley Project, located in California, including the Panoche Water District.

The BOR initially provided drainage services through the San Luis. San Joaquin Valley Drainage: San Luis Unit, Central Valley Project: Shasta and Trinity River Divisions, Central Valley Project: Solano Project: Tracy Fish Facilities Studies: Central Valley Project, California: progress report.

Central Valley Project. Save to favorites; A financial analysis of the authorized Central Valley Project. a San Luis Drain Feature Re-Evaluation Plan Formulation Report for the area located in the western San Joaquin Valley. The area consists of Westlands, Broadview, Panoche, Firebaugh, and Pacheco water districts and portions of San Luis Water District and Central California Irrigation District.

Long-established drainage practices for farmers in. Central Valley Project, California. INTERIM RENEWAL CONTRACT BETWEEN THE UNITED STATES AND.

WESTLANDS WATER DISTRICT PROVIDING FOR PROJECT WATER SERVICE SAN LUIS UNIT AND DELTA DIVISION Table of Contents. 73 the hiterior (Secretary) a duty to provide drainage service to the San Luis Unit; and 74 [] WHEREAS, the Contractor and the.

San Luis Unit, Central Valley Project Act of June 3,Public Law74 Stat.Section 5. Status. Active. Objectives. Construction and operation of drainage facilities designed to serve the general area of which the lands to be served by the San Luis Unit are a part.

Types of Assistance. Project Grants (Cooperative Agreements). Date Agency(or(Industry Event Department*of*Water* Resources Starts*preparing*update*of*Drainage*Management. As a result of a lawsuit claiming failure to provide drainage service to the San Luis Unit of the Central Valley Project, the U.S.

Department of Interior Bureau of Reclamation (Bureau) was ordered by the U.S. District Court, Ninth Circuit in to proceed with an application to the SWRCB for a discharge permit for the San Luis Drain. The San Luis Unit includes water storage and delivery facilities, such as dams, canals, and pumps, as well as the San Luis Drain.

This drain was designed to return used irrigation water to the delta, but it was never completed. Reclamation is considering two options to provide drainage for the San Luis Unit.